Definition & Meaning | English word PREFABRICATION
PREFABRICATION
Definitions of PREFABRICATION
- The manufacture of prefabricated components, and their assembly.
- A preassembled component.
Number of letters
14
Is palindrome
No
Examples of Using PREFABRICATION in a Sentence
- Unfamiliar with the capabilities of the Great Lakes yards, Kaiser Cargo used prefabrication techniques unsuited to the Great Lakes yards smaller cranes and had to rework them.
- Glatt went on to co-found CadMakers in 2014, a company that specializes in integrating advanced parametric design and construction technologies (such as automation, and prefabrication) with a focus on bringing manufacturing techniques into the construction industry.
- The 45-hectare site, about two kilometres from the city centre is well equipped shipbuilding and ship repair, with 3 slipways (Wulkan Nowy, Odra Nowa and Wulkan Stary), 750 m of quays, 80 000 sqm of prefabrication yards and over 10 ha of warehouses.
- The Commissioner's House of the Royal Naval Dockyard, Bermuda designed by Edward Holl and built in the 1820s, is considered to be the first residence that used cast iron structure, for the verandahs, and floor and roof framing, and proved the concept of prefabrication and transportation long distances.
- A result of this cooperation was the decision to cut production costs by starting a company that would provide prefabricated (precut and preformed) steel to the shipyards, thereby eliminating the necessity for each shipyard to invest in expensive prefabrication equipment.
- The rapid construction was facilitated by offsite prefabrication of many components such as cast iron windows, stone dressings, roof trusses, iron floor joists and decorative pieces of leadwork.
- It is the application of the Toyota Production System to the construction industry, with two parallel paths: Measuring (ASTM E2691) and improving productivity, as well as segregating and externalizing work through prefabrication and supply chain management.
- As with pre-stressed concrete, the pre- and post-tensioned methods can be used in different contexts: pre-tensioned stone may be more appropriate for prefabrication, while post-tensioning may be more suitable for on-site assembly.
- Remotely operated underwater vehicles (ROVs) and other types of submersible equipment are a lower risk alternative, but they are also expensive and limited in applications, so when reasonably practicable, most underwater construction involves either removing the water from the building site by dewatering behind a cofferdam or inside a caisson, or prefabrication of structural units off-site with mainly assembly and installation done on-site.
Search for PREFABRICATION in:
Page preparation took: 234.96 ms.